| It
is the most modern plant in Spain with more technological
advances all over, this makes the brick to be differentiated
in full with the rest of the competition. Its starting-up
dates the end of 2005.
We are talking about two manufacturing plants; the first
one of 4.000 m2 in which the earth grinding is carried out;
it is grinded so fine that the brick aspect calls the attention
for its incomparable finish. The second one is the production
plant of approximately 13.000 m2; in this plant the transformation
of clay to brick takes place, completely automated and robotized,
being able to reach 1250°C in the cooking of some bricks.
As in all the plants of the Mora
Group, strict quality controls take place, therefore
all the products manufactured in this plant count with the
AENOR stamp.
|